1.
Kalki Technologies | Solutions for Intelligent Energy Systems ...
Want to fast-forward your DLMS/COSEM or IEC 62056 based products and solutions. ... IEC 61850 standard is revolutionizing sub-station modernization in more ...
2.
Kalki Technologies | IEC 61850 Training | IEC 61850 Implementation ...
Kalkitech is a leading provider of IEC 61850 Consulting and Training to Utilities ... Kalkitech IEC 61850 training will cover the theory behind IEC-61850 by ...
3.
Kalki Technologies | Protocol Solutions for Energy Industry | IEC ...
IEC 61850 / UCA; IEEE C37.118; IEC 60870 5 101; IEC 60870 5 102; IEC 60870 5 103; IEC 60870 5 104; DNP3; ICCP / TASE.2 (IEC 60870-6); MMS (ISO 9506); Modbus ...
4.
Kalki Technologies | Protocol Solutions for Energy Industry | IEC ...
IEC 61850 Source Code Library, Implementation, Consulting and Training; IEEE C37.118 Source Code Library, Implementation, Consulting and Training ...
5.
Kalki Technologies | Protocol Solutions for Energy Industry | IEC ...
DLMS COSEM; ANSI C12.18/ C 12.19 / C12.22; IEC 61850; IEEE C37.118; IEC 60870-5-101; IEC 60870-5-102; IEC 60870-5-103; IEC 60870-5-104; DNP 3.0 ...
6.
KALKI Case Study: Industrial Electrical Load Management System
File Format: PDF/Adobe Acrobat - View as HTML Case Study: Industrial Electrical Load Management System. Copyright © Kalki Communication Technologies Private Limited (http://www.kalkitech.com E-mail: ...
7.
KALKI Case Study: GIS for Distribution SCADA
File Format: PDF/Adobe Acrobat - View as HTML tightly integrated to SCADA. The requirement also specified GIS Workstation capability and Hot-Backup switchover of the GIS along with the SCADA switchover. ...
8.
Oil and Gas Projects
File Format: PDF/Adobe Acrobat - View as HTML Scope: Engineering, documentation, FAT, Site Acceptance Test and. Commissioning. Substation SCADA for Middle-East Oil companies. Project name: SCADA systems ...
9.
KALKI Case Study: Modbus to IEC 60870-5-104 Protocol Converter ...
Modbus to IEC 60870-5-104 Protocol Converter. The Problem. The client, a Major OEM in the RTU and SCADA space, required to provide IEC 60870- ...
10.
KALKI Case Study: ICCP to IEC 60870-5-104 Protocol Gateway (KSGL/P)
File Format: PDF/Adobe Acrobat - View as HTML IEC 60870-5-104 protocol and the remote control center was connected on ICCP. The. ICCP Blocks 1,2,4 and 5 were supported on the gateway and were suitably ...