1.
Slinger Library This 10000 SF community library proposal was designed to accommodate Slinger's current book collection, future expansion and flexible meeting rooms. ...
2.
Brew City Barbecue Design-Build Brew City Barbecue was looking for an outdoor canopy so that their customers could enjoy the beautiful summer evenings with outdoor dining. ...
3.
TecStar Manufacturing Company The TecStar Project is a 96000 square foot addition to an existing 71000 square foot light manufacturing/office building. The addition houses an increase in ...
4.
TecStar Manufacturing Company The TecStar Project is a 96000 square foot addition to an existing 71000 square foot light manufacturing/office building. The addition houses an increase in ...
5.
6.
Village of Merton Pollworth Pavilion -Village of Merton Fireman's Park Merton, WI. The Pollworth Pavilion is a combined 4600 SF concession stand, public restrooms, ...
7.
^^k ^^k McDonald's Corporation M \m \ 11950 West Lake Park Dr^e for new and remodel construction when required. HDA has worked with McDonald's Corporation in the assembly of building plans for new ...
8.
Haag Muller, Inc. Architects, Engineers, schematics, design development, construction documents, commercial, residential, historic, institutional, adaptive reuse, financial, ... Show map of 101 E Grand Ave, Port Washington, WI 53074
9.
Haag Muller, Inc. Architects, Engineers, schematics, design development, construction documents, commercial, residential, historic, institutional, adaptive reuse, financial, ... Show map of 101 E Grand Ave, Port Washington, WI 53074
10.
Haag Muller, Inc. Architects, Engineers, schematics, design development, construction documents, commercial, residential, historic, institutional, adaptive reuse, financial, ... Show map of 101 E Grand Ave, Port Washington, WI 53074
|